Testing & Commissioning
Verifying control system functionality and supporting the transition from engineering and integration to operation in your facility
What we deliver
Coordinated testing and commissioning activities that help your team verify system behavior, identify issues, and prepare equipment for operation
Functional Testing
We verify control system functions against agreed requirements, including operating sequences, equipment responses, and expected system behavior
I/O & Device Verification
We check signal assignments, device communication, and the interaction between field equipment and the control system
Factory Acceptance Test Support
We support defined factory acceptance testing activities to review system functionality and document findings before equipment is deployed
On-Site Commissioning
We support control system startup, equipment checks, and functional verification at the installation site in coordination with the project team
Troubleshooting & Issue Resolution
We investigate control system issues identified during testing and commissioning, implement agreed corrections within our scope, and verify the resulting behavior
Front End Engineering Services
- Develop and execute functional checks based on agreed system requirements
- Verify I/O signals, device communication, operating sequences, and control system interfaces
- Support factory and site acceptance testing activities as defined in the project scope
- Assist with on-site control system startup and equipment integration
- Troubleshoot identified issues, coordinate corrections, and verify system behavior after changes
Key Deliverables
Functional Test Procedures & Checklists
I/O & Device Verification Records
FAT/SAT Test Records, Where Applicable
Issue Logs & Resolution Records
Commissioning & Handover Documentation
From Functional Verification to Site Handover
A structured testing and commissioning process that helps your team confirm system functionality, address identified issues, and document the results
1.
Test Planning & Requirements Review
Reviewing the agreed functional requirements, system configuration, testing responsibilities, and acceptance criteria
2.
Pre-Commissioning Checks
Verifying available system configurations, I/O assignments, device connections, and prerequisites before functional testing begins
3.
Functional Testing
Testing operating sequences, equipment interactions, operator commands, and relevant fault responses within the available test environment
4.
Site Commissioning & Troubleshooting
Supporting on-site startup, investigating identified issues, and verifying system behavior after agreed adjustments
5.
Results Review & Handover
Reviewing test findings with the project team and delivering the agreed verification records, issue status, and commissioning documentation
Clear Answers to Testing & Commissioning Questions
Learn how Rocatek approaches functional verification, on-site startup, and coordination with your project team
Testing verifies defined functions and system behavior against project requirements. Commissioning includes the activities needed to check, configure, and verify the installed system in its operating environment. The specific activities and responsibilities for each phase are established in the project scope.
Rocatek can support FAT and SAT activities when they are included in the agreed scope. We coordinate the applicable test procedures, system access, required participants, and documentation with the project team. Formal acceptance decisions remain with the parties designated for that responsibility
Yes. We can support verification and startup activities for control system modifications and equipment upgrades. Before implementation, we review the affected functions, existing system interfaces, testing requirements, and operational constraints with your team
We work with the project team to define the activities, equipment access, testing sequence, and operational coordination required for the agreed scope. Work affecting production or equipment operation is planned with the facility’s responsible personnel and carried out under its applicable site procedures
We document the observed behavior, investigate the issue within our area of responsibility, and coordinate the appropriate corrective action with the project team. After an agreed correction is implemented, the affected function is tested again and its status is recorded
Preparing to Test or Commission Your Control System?
Whether you are validating a new application, integrating equipment, or preparing for on-site startup, Rocatek can help define the testing and commissioning support your project requires